Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 40 results ...
Abdelhamid, T S (1999) Measuring and evaluating physiological demands of construction work, Unpublished PhD Thesis, , University of Michigan.
Al-Hussayen, M A (1980) Building problems in Saudi Arabia: The need for building research, and the development of building research approaches, Unpublished PhD Thesis, , University of Michigan.
Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics, Unpublished PhD Thesis, , University of Michigan.
Behzadan, A H (2008) Arviscope: Georeferenced visualization of dynamic construction processes in three-dimensional outdoor augmented reality, Unpublished PhD Thesis, , University of Michigan.
Chen, T Y-J (2019) Advancing quantitative risk analysis for critical water infrastructure, Unpublished PhD Thesis, , University of Michigan.
Choi, B (2018) The role of socio-cognitive process in construction workers' safety behaviors, Unpublished PhD Thesis, , University of Michigan.
Chung, K H Y (2022) Data fusion, hedonic pricing, and blockchains: Lowering investment barriers for sustainable infrastructure, Unpublished PhD Thesis, , University of Michigan.
Colberg, M R (1950) Federal control of construction following World War II, Unpublished PhD Thesis, , University of Michigan.
Dias, A, Jr. (1994) A managerial and financial study on the involvement of private sector companies in the development, construction, operation, and ownership of infrastructure projects, Unpublished PhD Thesis, , University of Michigan.
Dzeng, R-J (1995) CasePlan: a case-based planner and scheduler for construction using product modeling, Unpublished PhD Thesis, Department of Civil and Environmental Engineering, University of Michigan.
Han, S-H (2004) A working prototype of distributed collaborative architectural design system, Unpublished PhD Thesis, , University of Michigan.
Hasell, M J (1983) Gaming simulation: A communication tool for architects and designers, Unpublished PhD Thesis, , University of Michigan.
Henn, R L (2013) Moving targets: Managing interinstitutional relationships in green building design and construction, Unpublished PhD Thesis, , University of Michigan.
Howe, A S (1998) A new paradigm for life-cycle management of kit-of-parts building systems, Unpublished PhD Thesis, , University of Michigan.
Ismail, I A (2014) Financial cash flow determinants of company failure in the construction industry, Unpublished PhD Thesis, , University of Michigan.
Jebelli, H (2019) Wearable biosensors to understand construction workers' mental and physical stress, Unpublished PhD Thesis, , University of Michigan.
Kabo, F W (2006) Low-cost housing design and provision: A case study of Kenya, Unpublished PhD Thesis, , University of Michigan.
Kalampakorn, S (2000) Stages of construction workers' use of hearing protection, Unpublished PhD Thesis, , University of Michigan.
Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities, Unpublished PhD Thesis, , University of Michigan.
Kirk, S J (1992) Improved design decision-making using small group value engineering gaming/simulation, Unpublished PhD Thesis, , University of Michigan.
Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures, Unpublished PhD Thesis, , University of Michigan.
Leu, S-S (1992) Object-oriented representation model of construction technology information, Unpublished PhD Thesis, , University of Michigan.
Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams, Unpublished PhD Thesis, , University of Michigan.
Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment, Unpublished PhD Thesis, , University of Michigan.
Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work, Unpublished PhD Thesis, , University of Michigan.
Martin, S D (1981) Building contracts in classical Roman law, Unpublished PhD Thesis, , University of Michigan.
Mason, B (2023) Advancing autonomous green stormwater infrastructure, Unpublished PhD Thesis, , University of Michigan.
McIntosh, J F (1984) The application of the relational data model to computer-aided building design, Unpublished PhD Thesis, , University of Michigan.
Odeh, A M (1992) CIPROS: Knowledge-based construction integrated project and process planning simulation system, Unpublished PhD Thesis, , University of Michigan.
Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies, Unpublished PhD Thesis, , University of Michigan.
Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan, Unpublished PhD Thesis, , University of Michigan.
Sherif, A H (1988) The choice of construction technology in developing countries: A socially conscious economic assessment approach, Unpublished PhD Thesis, , University of Michigan.
Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations, Unpublished PhD Thesis, , University of Michigan.
Stino, R M (1999) Effect of spatial variables on bricklaying productivity and ergonomics, Unpublished PhD Thesis, , University of Michigan.
Sugrue, D P (2021) Alternative financing for harbor infrastructure using big data analytics in the great lakes waterway, Unpublished PhD Thesis, , University of Michigan.
Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost, Unpublished PhD Thesis, , University of Michigan.
Tharachai, T (2004) Multiple project resource scheduling for construction, Unpublished PhD Thesis, , University of Michigan.
Thomas, A (2017) Modeling occupant behavior, systems life cycle performance, and energy consumption nexus in buildings using multi-method distributed simulation, Unpublished PhD Thesis, , University of Michigan.
Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction, Unpublished PhD Thesis, , University of Michigan.
Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites, Unpublished PhD Thesis, Department of Civil and Environmental Engineering, University of Michigan.